For the purpose of determining an extractive mineral lease application fee, the proposed annual production rate is the figure stated in the mining proposal (MP) document. The annual production rate should be stated in tonnes per annum. An annual production rate of greater than 100,000 tonnes per annum aligns with the trigger for when an Environment Protection Authority (EPA) licence is required for extractive industries.
