Skip to content

Bird in Hand Gold Project - request to Terramin to provide Response Document ¦ New exploration and mining fee structure from 1 January 2020 ¦ Accelerated Discovery Initiative ¦ ExploreSA: The Gawler Challenge

For the purpose of determining a PEPR or MOP fee, the proposed annual production rate is the figure stated in the submitted/proposed PEPR or MOP. The annual production rate should be stated in tonnes per annum.

An annual production rate of greater than 100,000 tonnes per annum aligns with the trigger for when an Environment Protection Authority (EPA) licence is required for extractive industries.