The Accelerated Discovery Initiative (ADI) embraces innovation, collaboration and capacity building to advance exploration activity in South Australia.

Update: 16 June 2022

Successful applicants for round three of the ADI have been announced by the South Australian Government Minister for Energy and Mining, allocating $3.26 million (excluding GST) in co-funding to 17 project proposals.

Successful projects

Includes project final reports where available.

  • Round 3 of Accelerated Discovery Initiative (ADI)Successful applicants for round three of the Accelerated Discovery Initiative were announced by the Minister for Energy and Mining on 15 June 2022, allocating almost $3.26 million in funding to 17 companies to drive mineral exploration growth in South Australia.

    Round three funded projects

    Company Project name Key commodity Co-funding activity supported

    EnviroCopper Limited

    Determining ISR amenability in non-traditional geological settings from surface geophysical measurements

    Copper

    Geophysical program

    Havilah Resources

    Benagerie Dyke

    Iron-sulfide copper gold (ISCG), platinum group elements and REE

    Exploration drilling

    IGO Limited

    Utilising seismic to map, validate and understand 3D basin architecture and vector potential locations of sediment-hosted copper mineralisation at the Copper Coast project

    Sediment-hosted copper

    Geophysical program

    Inception Consulting Engineers

    In-situ recovery Exploration – Evaluating economic recovery of greenfields deposits

    Uranium

    Proof of concept

    Indiana Resources Limited

    VMS potential of the Harris Greenstone Domain

    Zinc and nickel

    Geophysical program

    Lady Alice Mines

    Central Gawler Gold Province prospect scale CSAMT and Loupe TEM survey method assessment

    Gold

    Geophysical program

    OneSteel Manufacturing

    Unravelling the stratigraphy of the Middleback Ranges

    Iron ore

    Exploration drilling

    OZ Minerals

    Real time seismic tomography as ML target validation
    (This project has been withdrawn)

    Iron oxide copper gold (IOCG)

    Proof of concept

    Petratherm Limited

    Deep EM surveying for large BHT and ISCG deposits

    Broken Hill style and iron-sulfide copper gold (ISCG)

    Geophysical program

    Petratherm Limited

    Woomera - stratabound IOCG drilling program

    Iron oxide copper gold (IOCG)

    Exploration drilling

    Roma Resources SA Pty Ltd

    Tarcoola corridor 2D seismic survey

    Gold

    Geophysical program

    Roma Resources SA Pty Ltd

    Tarcoola corridor drill test validation of GPR trial output data

    Gold

    Exploration drilling

    Roma Resources SA Pty Ltd

    Trialling of CSIRO DetectOre and Ultrafine+ analyses in Tunkillia regolith setting

    Gold

    Proof of concept

    Seesaw Resources Pty Ltd

    Brownlow EL5744 (ELA 2020-00212)
    (This project has been withdrawn)

    Copper, gold, REE, lead and zinc

    Exploration drilling

    Strikeline Resources Pty Ltd

    Critical minerals in the Adelaide Fold Belt

    Rare earth element (REE)

    Exploration drilling

    Strikeline Resources Pty Ltd

    Sediment-hosted copper in the Adelaide Fold Belt

    Copper

    Exploration drilling

    Woomera Mining Limited

    Woomera Mining - Musgrave aircore drilling program

    Nickel and copper

    Exploration drilling

    Back to top

  • Successful Round 2 projects were announced on 20 May 2021.

    Proponent company Project name Co-funding activity supported
    Western Areas Limited Western Gawler project: magnetotelluric (MT), passive seismic and magnetic modelling study Geophysical programs
    Hillgrove Resources Ltd Testing of geochemical and ML techniques on sulfide mineralisation covered by Murray Basin Research collaboration
    Western Areas Limited Sahara Prospect model test and core scanning - diamond drilling Exploration drilling, Research collaboration
    Alliance (Eyre) Pty Ltd An exploration model for Au mineralisation in the southern Gawler Craton Exploration drilling, Research collaboration
    Hillgrove Resources Testing of deep MT zone of monzonite related Cu-Au near Kanmantoo Exploration drilling
    Petratherm Limited Geochemical sampling method to locate blind gold deposits in the Gawler Craton Proof of concept
    FMG Resources Pty Ltd Integrated exploration under deep cover: geophysics, geochronology, geochemistry Research collaboration, Aboriginal employment
    Coda Minerals Emmie Bluff calibration VTEM™ Geophysical programs
    Hale Energy Pty Ltd Alford East copper oxide project Proof of concept, Exploration drilling, Groundwater
    FMG Resources Pty Ltd Eastern Eyre Peninsula and Northern Curnamona gravity survey Geophysical programs
    Sinosteel Uranium SA Pty Ltd SUSA Curnamona geochemical sampling program 2021 Proof of concept, Research collaboration
    Flinders Prospecting / IGO Limited Stratigraphic drilling to assess the potential for sediment hosted copper mineralisation in the basal stratigraphy of the Adelaidean Exploration drilling
    Tigers Dominion Group Pty Ltd (TDG) Mount Brady project Exploration drilling, Aboriginal employment
    Barton Gold Pty Ltd Reinvigoration of regional gold exploration in the Tarcoola District Proof of concept, Exploration drilling, Geophysics, Research collaboration
    Boart Longyear Driller deployable cross hole tomography Proof of concept, Exploration drilling
    Strikeline Resources Pty Ltd Mt Craig copper project Exploration drilling, Geophysics program, Aboriginal employment
    Cohiba Minerals Limited Pernatty C ZCB project Exploration drilling
    Copper Search Australia Pty Ltd Douglas Creek drilling program Exploration drilling
    SIG Machine Learning Pty Ltd Greenfields Gawler target generation - from ExploreSA to exploration Proof of concept
    Longreach No.1 Pty Ltd Walparuta project Geophysical programs
    Flinders Prospecting / IGO Limited A new approach to mapping basin architecture using airborne MT over the Copper Coast Region Geophysical programs
    Red Tiger Resources Limited (RTR) Mulgathing project Geophysical programs, Aboriginal employment

    Round 2 funded project locations

    ADI Round 2 successful applicants

    Back to top

  • Successful applicants for Round 1 of the Accelerated Discovery Initiative were announced on 23 June 2020.

    Proponent company Project name Co-funding activity supported
    DGO Gold Limited Testing the Zambian Copper Belt model on the Stuart Shelf
    (This project has been withdrawn)        
    Exploration drilling, Geophysical programs, Research collaboration
    Havilah Resources Limited Jupiter MT anomaly definition study Geophysical program, Research collaboration
    Boss Resources Utilising 3D passive seismic and slalom high-definition seismic reflection Geophysical program, Exploration drilling, Aboriginal employment
    Argonaut Resources Murdie IOCG Project Exploration drilling, Geophysical program, Logistical support, Aboriginal employment
    Petratherm Ltd Eastern Mabel Creek Ridge (Deeps) Exploration drilling
    FQM Exploration Geochemical mapping of a copper mineral system Proof of concept, Logistical support, Aboriginal employment
    FMG Resources Roopena Fault Zone infill ground gravity Geophysical program
    Minotaur Exploration Ltd Using innovation to enter a new frontier - taking new IOCG model to the Peake and Denison Inliers Exploration drilling, Geophysical program
    Havilah Resources Limited Investigation of REE mineralisation in the Benagerie Dome Exploration drilling
    Fleet Space Technologies Large arrays of wireless sensors for remote mapping of heat flow Geophysical program, Research collaboration, Proof of concept
    Marmota Ltd Expressions of mineralisation in surface plant biochemistry on the NW Gawler Craton Proof of concept, Exploration drilling, Aboriginal employment
    Ausmex Mining Group Ltd Intrusive related mineral systems, Delamerian Orogeny, Burra SA
    (This project has been withdrawn)        
    Geophysical program, Exploration drilling
    Andromeda Metals Ltd Andromeda Metals Halloysite Quantification Project 
    (This project has been withdrawn)
    Research collaboration
    Alligator Energy Greenfield exploration for ISR uranium deposits in the Cooper Basin Exploration drilling

    Round 1 funded project locations

    ADI Round 1 successful applicants

    Back to top

  • More information

  • A total of $10 million over 3 years is available for approved co-funding exploration activities:

    • Exploration drilling - single deep hole and multiple hole programs in frontier terrains, or drill testing new models and concepts
    • Geophysical programs that focus on the application of innovation technology or improve the density or quality of data and accelerate data sharing amongst the exploration sector
    • Logistical support associated with testing exploration in remote greenfields/new frontier regions
    • Groundwater identification and testing
    • Research collaboration and/or technology development such as machine learning
    • Proof of concept proposals that challenge traditional thinking and drive new investment within and beyond the resources sector
  • The awarding of ADI funding involves two assessment stages:

    1. An initial call for Expressions of Interest (EOI) for internal merits review by the Department for Energy and Mining.
    2. Projects approved through the EOI stage will be invited to make a detailed submission in the Request for Proposals round.
  • Timeframe for Round three

    DateMilestone
    26 November 2021 Call for Expressions of Interest (EOI)
    19 December 2021 Online EOI close (late applications will not be accepted)
    20 December 2021 to 16 January 2022 EOI assessment and feedback
    17 January 2022 Request for Proposals (RFP) open
    6 February 2022 RFP close
    February 2022 Proposal assessment by Expert Review Panel (ERP)
    March 2022 Proposal assessment close
    June  2022 Recipients announced
  • Note: This guideline may be revised and it is the responsibility of the reader to ensure the most current revision is being referred to.
    Last revised August 2021

    On this page
    1. Introduction
    2. Objectives
    3. Funding process and important dates
    4. Method of investment
    5. Essential eligibility criteria
    6. Assessment
    7. How to apply
    8. Legal parameters
    9. Acceptance criteria

    1 Introduction

    A strong resources sector is an essential component of South Australia’s prosperity. Accounting for more than 35% of state exports, increased mining, mineral processing and supply chain activities are crucial to achieving the South Australian 3% growth target. Resource sector growth relies on sustained exploration activity and a healthy pipeline of mineral discoveries.

    Despite proven potential to develop commercial, globally significant deposits of copper, gold, uranium, heavy-mineral sands, graphite, iron ore and other in-demand commodities, vast areas of the state remain underexplored. The remoteness of, and in some instances, the depth of the state’s mineral deposits below ground surface, are widely recognised as a challenge to exploration.

    The state’s potential for discovering world-class new mineral resources has once again been demonstrated by the 2018 BHP’s Oak Dam West copper discovery and continued exploration works.

    Collaboration and innovation in exploration activities and approaches is key to unlocking the state’s significant resource opportunity, and accelerating discovery.

    Continued advances in global technology and innovation, as well as the state’s tertiary and technology sectors, including defence and space, can have the potential to further accelerate mineral discovery, improve exploration efficiencies, reduce costs and resource needs, reduce exploration footprints and support the potential for commercialisation of exploration innovation.

    The Accelerated Discovery Initiative (ADI) embraces innovation, collaboration and capacity building to advance exploration activity in South Australia, reinforcing the state’s international reputation as a leader in mining and mineral exploration.

    1.1 About the initiative

    The ADI aims to make a major contribution to achieving South Australia's Growth State target through supporting the potential discovery of new mineral and groundwater resources, while delivering a number of other economic and social benefits including:

    • Aboriginal employment opportunities
    • data to support development of regional and rural communities, and
    • development and application of innovative exploration technologies.

    To do this, co-funding contributions will be provided from Government toward exploration activities.

    A total of approximately $9 million is available of the 3 years (2020–2022FY) for approved co-funding exploration activities. The first funding year commenced in FY2019–2020 and Rounds will be accessible via annual expressions of interest.

    Up to $10 million will be invested over the life of the program, including program management.

    This document provides guidance for proponents considering submitting a proposal for co-funding from the ADI by describing the:

    • Objectives
    • Process and important dates
    • Method of investment
    • Essential eligibility criteria
    • Proposal assessment
    • How to apply
    • Legal parameters
    • Acceptance criteria

    Table 1:  Summary of the ADI funding categories that form the scope of the program.

    Category nameDescription
    Exploration drilling Exploration drilling - single deep holes and/or multiple hole programs in frontier terrains or testing new concepts in other areas
    Geophysical programs Geophysical programs that focus on the application of innovative technology and concepts and/or provide for a significant improvement in the density or quality of data at a district or regional scale
    Logistical support Logistical support for testing exploration targets in remote greenfields/new frontier regions (for example remote or under-explored territory with limited to no existing access or infrastructure, environmentally sensitive areas that require new, untested or innovative logistic approaches to carry out on-ground exploration)
    Groundwater Increasing sampling and testing of ground water encountered during mineral exploration - groundwater identification and testing to Environment Protection Authority (EPA) prescribed guidelines
    Research collaboration Research collaboration and/or technology development (for example machine learning) projects that will benefit mineral exploration and accelerate discovery
    Proof of concept Proof-of-concept proposals that encourage new thinking and innovation in the exploration sector
    Aboriginal employment Employment of Aboriginal personnel during exploration activities

    Back to top

    2 Objectives

    The objectives of the ADI are to:

    • Accelerate mineral discovery
    • Increase greenfield mineral exploration collaboration and activity
    • Accelerate data sharing from, and application of innovative technologies within, exploration activities for the benefit of third-parties (note, data is not intended to remain proprietary of the exploration group)
    • Facilitate employment and upskilling of Aboriginal employees or businesses by part funding employment and and/or training during exploration programs
    • Increase the state’s groundwater datasets

    2.1 Outcomes

    The ADI will contribute to achieving South Australia Growth Agenda targets through support of the discovery of new mineral resources, and accelerated data sharing amongst industry.

    The Initiative will build South Australia’s international profile through the attraction of new investors willing to develop and test innovative exploration concepts and technology to help unlock the state’s mineral opportunity. It will also support South Australia’s growing reputation as a place to successfully collaborate on research and development.

    The ADI may assist in accessing and leveraging risk capital for mineral exploration.

    Discovery of new groundwater resources will aid the development of regional communities and agricultural industries as well as new resource projects.

    Co-contribution to Aboriginal employment will increase the potential for direct participation of Aboriginal personnel and businesses within South Australia’s mineral resource industry, in particular exploration.

    Back to top

    3 Funding process and important dates for Round 3

    The award of ADI funding involves two assessment stages:

    • an initial call for Expressions of Interest (EOI) for internal merits review by the Department for Energy and Mining, and
    • formal invitation for those eligible and appropriate projects approved through the EOI stage, to make a detailed submission in the Request for Proposals round.

    The Department for Energy and Mining will provide feedback to proponents of EOI submissions that do not progress to the second stage. These proponents will be able to reapply to future ADI rounds.

    Table 2: Timeline for ADI funding Round 3 (2021/2022)
    Note: this timeline may be subject to change 

    DateMilestone
    26 November 2021 Call for Expressions of Interest (EOI)
    19 December 2021 Online EOI close (late applications will not be accepted)
    20 December 2021 to 16 January 2022 EOI assessment and feedback
    17 January 2022 Request for Proposals (RFP) open
    6 February 2022 RFP close
    February 2022 Proposal assessment by Expert Review Panel (ERP)
    March 2022 Proposal assessment close
    April 2022 Announce recipients

    Back to top

    4 Method of investment

    4.1 Eligible and non-eligible exploration activities

    Mineral exploration activities may include, but are not limited to:

    • Exploration drilling - single deep holes and/or multiple hole programs in frontier terrains, or drill testing new models and concepts. This activity includes:
      • Direct drilling costs (including mobilisation and demobilisation)
      • Geochemical assays and petrology
      • Downhole geophysical investigations.
    • Geophysical programs that focus on the application of innovative technology and concepts and/or provide for a significant improvement in the density or quality of data at a district or regional scale.
    • Logistical support associated with testing exploration targets in remote greenfields/new frontier regions. This could include specialised equipment, vehicles or telecommunications for exploration in remote, environmentally sensitive areas.
    • Groundwater identification and increased sampling and testing to Environment Protection Authority (EPA) prescribed guidelines (PDF, 1.3 MB).
    • Research collaboration and/or technology development (eg machine learning) projects that will benefit exploration and accelerate discovery.
    • Proof-of-concept proposals that challenge traditional thinking, encourage innovation and drive new investment within and beyond the resources sector.

    Please note, the following exploration activities are not within the scope of the ADI program and will not be supported for funding:

    • The conduct of geotechnical test work and collecting bulk samples required to evaluate the metallurgical and physical properties of a mineral deposit or the economic potential of such a deposit
    • Environmental studies required to support the development of a retention lease (RL) or mining lease (ML) application and a program for environment protection and rehabilitation (PEPR) submission
    • Projects conducting resource evaluation drilling or incremental evaluation of existing mineralisation (as opposed to projects contemplating proof-of-concept evaluation)
    • Projects that do not share learnings, data, technology or the option to commercialise intellectual property (IP)
    • Other local Government departments submitting applications

    The exploration activities detailed in an EOI or a proposal must not have commenced prior to formal notification that a proposal has been awarded ADI funding. Projects that have already commenced or are about to commence prior to notification will not be further considered in the assessment process. No retrospective funding will be provided to any activities of a successful ADI Proposal if they occurred prior to formal notification.

    Proponents will be required to detail each type(s) of activity for which funding is sought. For multiple activity proposals, the relationship between activities should be described, with each activity assessed on its own merits.

    The ADI is open to all mineral commodities, however alignment with the Government’s commodity strategies and areas of interest will be considered, including copper, gold, magnetite and critical minerals.

    4.2 Exploration activity funding

    All grant funding is provided GST Exclusive.

    Co-funding is available for eligible exploration activities for 50 per cent of direct costs, up to a maximum value depending on the activity category.

    • For exploration drilling, co-funding is available for up to 50 per cent of direct costs, to a maximum of $250,000.
    • For geophysical programs, co-funding up to 50 per cent of direct costs, to a maximum of $150,000.
    • Logistical support - co-funding of up to 50 per cent of logistics costs not already covered in the proposal, up to $100,000.
    • Groundwater testing - up to 50 per cent of direct costs, to a maximum of $50,000.
    • Research collaboration, or proof-of-concept proposals not already covered in the proposal - up to 50 per cent of direct costs, maximum of $200,000.
    • For a proposal with more than one exploration activity, the maximum value of ADI co-funding available is $300,000 for that proposal.

    4.2.1 Administrative and other costs excluded

    Direct exploration activity costs specifically do not include administration, program management, legal, or land access (including native title, heritage or landowner engagement and agreement-making).

    4.3 Aboriginal employment

    In addition to any funding sought for eligible exploration activities defined in section 4.1, proponents are able to apply for co-funding of the employment of Aboriginal employees or businesses, where this expenditure is directly related to mineral exploration activities.

    Funding support of 50 per cent of the direct, demonstrable employment and/or training costs is available up to a maximum value of $25,000 (GST exclusive).

    4.4 Timeframe to complete funded activities

    The ADI has been designed to stimulate exploration activity, collaboration and investment in new or under-explored areas, new techniques and new ideas, rather than to fund existing programs.

    The exploration activities detailed in an EOI or proposal must not have commenced prior to notification that the proposal has been successful in being awarded funding.

    Preference will be given to activities that are likely to be completed within one year, or that have expedited timeframes for completion and release of data.

    Payment of the grant funding will be on completion of the project and submission of an acceptable final (or, if applicable, interim) report.

    4.5 Multiple applications

    Companies may submit more than one EOI or proposal in the same ADI funding round, however applications beyond the first two of a similar nature will be discounted in the evaluation process.

    Back to top

    5 Essential eligibility criteria

    5.1 Essential criteria

    Proposals must satisfy the following essential eligibility criteria to be considered for assessment.

    The proposal:

    • must be submitted using the online template provided by the South Australian Government.

    The proponent:

    • is a legal entity with which the South Australian Government can enter into a legally binding agreement
    • has an Australian Business Number
    • is registered for GST
    • is financially viable, as evidenced through independently prepared financial statements and records of the applicant and its related entities
    • will be asked during the EOI and proposal stage whether they (company/partners) have been issued a notice, direction or order within the last five years regarding non-compliance in the conduct of any authorised operations within Australia. If yes, more detailed information will be requested
    • should note that funding will not be open of other South Australian Government Departments
    • must be willing to share and make available all findings from their ADI supported exploration activities to benefit third parties (ie data provided in interim/final report(s))

    5.2 Compliance with guidelines

    By submitting a response (at both EOI and proposal stage), the proponent accepts the terms of the Investment Guidelines.

    The State retains the right to extend, accelerate, remove, introduce or alter any element (including timetable, eligibility criteria, method of assessment, process requirements, etc.) of the Investment Guidelines at any time, at its discretion.

    5.3 Funding agreement

    Funded participants will be required to enter into a funding agreement with the Minister for Energy and Mining, on behalf of the state of South Australia.

    The Draft Funding Agreement (PDF, 445.4 KB) will provide the legal framework for the obligations of each party and terms in relation to the funded exploration activity.

    The ADI standard funding agreement is provided in its final form and, as such, is not open to any further renegotiation of its substantive terms.

    5.3.1 Exploration licence holder

    Where activities directly relate to regulated (under the Mining Act 1971) mineral exploration activities, funding agreements are to be written in the name of the registered exploration licence (EL) holder.

    Where activities directly relate to regulated mineral exploration activities, and the proponent is not the EL holder for the land on which the activity will take place, evidence must be provided that the proponent has authority to act as an agent for the EL holder in the submission, management and execution of work programs. This evidence is required to be provided in the form of a legally binding agreement between the proponent and registered EL holder.

    5.4 Collaborative applications

    Research Collaboration Proposals are required to select a ‘lead’ organisation as proponent, who will be party to the funding agreement and be responsible for delivery of the agreed outcomes.

    5.5 Intellectual property and knowledge sharing

    Accelerated knowledge sharing is a key outcome of the ADI.

    All exploration data and information acquired by the exploration activities outlined in the successful proposal must be provided to the Department for Energy and Mining for release to the industry.

    Where the proposal applies innovative technology, proof of concept, artificial intelligence and/or collaboration, proponents must outline how the knowledge gained can and will be shared and used by third parties.

    The proposal application process will require a knowledge sharing plan be provided.

    5.6 Project reporting

    A project report is required to be submitted within three months of completing the exploration activity to receive ADI funding.

    The expected form and content of the final report is to be outlined within the proposal.

    Where the exploration activity involves drilling, geophysical or groundwater exploration, activities reports must follow the minimum requirements set out within respective activity guidelines.

    Download:

    An interim report may be negotiated by proponents to receive early release of funding, up to 50 per cent (as agreed by both parties).

    Back to top

    6 Assessment

    6.1 Merit criteria

    Proposals will be assessed against the following merit criteria. Applications should address as many criteria as possible, however may not conform to all.

    Assessment will be made with regard to the extent to which the proposal meets the criteria.

    Strategic alignment

    • Addresses a key knowledge gap and/or critical uncertainty of the state's geoscience information, and/or a key barrier to mineral exploration and development in South Australia
    • Supports exploration of remote or frontier mineral resources
    • Has the potential to stimulate new mineral discoveries, enhance mineral prospectivity and exploration investment opportunities
    • Demonstrates the potential for data, knowledge and/or techniques generated or proven by the proposal to provide third party benefit toward achieving the state's strategic mineral objectives (including, but not limited to, help stimulate new mineral discoveries, enhance mineral prospectivity and exploration investment opportunities)
    • Is aligned to the state's priority commodity types (eg copper, gold, magnetite, technology or critical minerals) and/or will facilitate significant economic development opportunities

    Collaboration

    • Provided opportunity for collaboration on data gathering and/or technology development and commercialisation between industry, government and academic research partners

    Innovation

    • Tests a new method, technique or technology

    Aboriginal employment

    • Provides direct Aboriginal staff or employment, with potential for upskilling, as a component of the proposal

    Technical

    • Details the regional and geological context of the proposal and data/knowledge gaps to be addressed
    • Sufficient evidence provided, and previous data/research appropriately referenced, to demonstrate the approach can feasibly achieve the stated objectives, outcomes and benefits
    • Evidence of the proponents capability and capacity to deliver the proposal
    • Documents an appropriate approach to stakeholder engagement
    • Provides:
      • A detailed project schedule
      • An outline of the final report content
      • A knowledge sharing plan
    • Provides evidence of the financial viability of the proposal or that sufficient funding is available
    • Identifies any risks or other constraints on delivering the proposal

    6.2 Assessment process

    Consideration of expressions of interest will be made with reference to the merit criteria by the Department for Energy and Mining.

    Following shortlisting, successful applicants will be invited to submit a funding proposal. Proponents not shortlisted will be notified.

    Proposals will be assessed against merit criteria by an expert panel of officers and independent industry representatives appointed by the Department for Mining and Energy.

    The South Australian Government is under no obligation to release any details relating to the assessment of proposals.

    There will be no right of appeal.

    Back to top

    7 How to apply

    Completed online Expressions of Interest (stage 1) and Proposals (stage 2) will be due by the published closing date for each round of the ADI.

    It is the proponent’s responsibility to ensure the online information is submitted by the specified closing date/time and acknowledgment, in accordance with the contact details provided, will be made on receipt of each application.

    Late submissions will not be accepted.

    What to submit

    Proponents should complete the online ADI proposal form

    7.1 Confidentiality and commercial-in-confidence

    If a proponent believes that any information provided in their proposal is confidential or commercial-in-confidence, the proponent must clearly identify such information and the reason for its confidentiality.

    Proponents should be aware that ADI is subject to certain legislative and administrative accountability and transparency requirements of the Australian Government and Government of South Australia, including public disclosure in accordance with Department for Energy and Mining policy.

    Any information contained in, or relating to a proposal submitted to ADI, including information identified by a proponent as confidential, may be disclosed by DEM:

    • to its employees, advisers or third parties in order to evaluate and assess a proposal
    • within the Government of South Australia or other entities where this serves the legitimate interest of DEM
    • in response to a request by a House or Committee of the Parliament of South Australia
    • if the proposal is successful, for promotion of project activities and outcomes
    • where information is authorised or permitted by law to be disclosed
    • where the information is already in the public domain.

    7.2 Conflict of interest

    Proponents should declare to the best of their knowledge, any matters which might give rise to a real or perceived conflict of interest.

    7.3 Miscellanceous

    Nothing in the Investment Guidelines should be construed as creating any binding contract, estoppel, expectation or other legal relationship (express or implied) between the proponent and the State, and each proponent irrevocably releases the State in relation to any claims, actions, damages, judgements, losses, remedies or other matters whether in contract, negligence, tort, under statute, equitable relief or otherwise, in conjunction with this process.

    Back to top

    1. Subject to Item 2 below, contents of all proposals will remain confidential, except for the relevant tenement and location of the successful proposals. All successful proposals will be made public on release of the final report. Unsuccessful proposals will remain confidential unless the proponent consents to their release.
    2. Although the principal (being DEM or its representatives) understands the need to keep commercial matters confidential in appropriate circumstances, the principal reserves the right to disclose some or all of the contents of the proposal as a consequence of a constitutional convention or in order that the relevant Minister may answer questions raised in the South Australian Parliament, keep Parliament informed or otherwise discharge the Minister’s duties and obligations to Parliament and to advise the Governor, Parliament and/or the South Australian Government. Any condition in a proposal that purports to prohibit or restrict the Minister’s right to make such disclosures cannot be accepted. Confidentiality of proposals is also subject to the Freedom of Information Act 1991, as amended.
    3. If you do not accept certain aspects of these parameters of proposals, state which you do not accept and what you suggest as an alternative. If no such statement is made the principal will assume that you have accepted all conditions.
    4. Reservation of rights – the principal reserves the right to:
      (i)   Amend the proposal closing date;
      (ii)  Amend the conditions for proposals at any time prior to the closing date for proposals, provided that the amendment is notified to prospective proponents;
      (iii) Clarify any aspect of a proposal after the closing date for proposals but before the evaluation of a proposal;
      (iv) Seek the advice of external consultants to assist the principal in evaluation or review of proposals; and
      (v)  Abandon the process whether before or after the receipt of proposals.
    5. The principal is not obliged to accept any proposal.
    6. The principal may consider or accept (at the principal’s sole discretion) any proposal including without limitation a late proposal or the proposal of a proponent who has failed to submit a proposal in accordance with published requirements.
    7. No acceptance of a proposal will be effective to constitute a contract or to create any legitimate expectation on the part of the proponent unless a formal written contract is executed by both parties.
    8. Prior to accepting a proposal the principal may request that you provide additional information, including but not limited to, evidence of your economic capacity and financial stability.
    9. The principal will notify proponents if this process has been abandoned. The principal is not obliged to give any reasons for its selection or the abandonment of this process.
    10. If you submit a proposal, the principal, when considering the proposal will expect that you satisfy the following criteria:
      (i)  you have the necessary skills, knowledge and experience to comply with the conditions for proposals and undertake the proposed drilling or exploration activity project; and
      (ii) you have fully informed yourself of all facts and conditions of all things relating to ADI guidelines.
    11. Proponents are responsible for the cost of preparing and submitting their proposal and all other costs arising out of the process.

    Closing date(s) for proposal submission will be published on this website.

    Back to top

    9. Acceptance criteria

    The following principles will apply to management of successful Accelerated Discovery Initiative projects.

    1. Management of the projects will be undertaken by the project proponents and/or operational nominees. All liabilities associated with the project remain with the lead proponent.
    2. Proposals will be subject to an Agreement of Conditions of Grant to be prepared by the South Australian Crown Solicitors Office.
    3. A Final Funding Agreement (2 copies) will be prepared and forwarded to the proponent for execution. Both copies are then to be returned to DEM for the principal’s execution.
    4. A proponent must only apply the grant funding for the purpose of the project.
    5. Where the cost of co-funded activities for a completed project are less than the estimate in the proposal, DEM will provide grant funding in proportion to the ratio of funding requested and the estimated total cost of funded activities (where below the cap).
    6. Drilling must be conducted in accordance with an approved program for environment protection and rehabilitation (PEPR) and comply with relevant land access and environmental management requirements (eg Part 9B of the Mining Act 1971 and the Aboriginal Heritage Act 1988).
    7. Payment schedule:

      (i)  Where an interim report is agreed, interim payment will be half of the agreed funds and paid within 30 days of acceptance of an interim report;

      (ii) Final payment will be made on lodgement and acceptance of the final project report containing all technical information (correctly presented) that is directly relevant to the drilling project.
    8. Details of the interim and final project report and all deliverables will be defined in an Accelerated Discovery Initiative Funding Agreement between the successful proponent and the Minister for Energy and Mining.
    9. Accelerated Discovery Initiative grant funding cannot be included as part of company mineral exploration licence expenditure commitments.

    Back to top

  • Should you have an enquiry please contact the team at DEM.ADI@sa.gov.au

  • To stay informed of the latest ADI news and developments you can subscribe for updates.