29 August 2023 | F2023/001060 | 1) All documents relating to the application for, consideration of, and granting of any mineral claim or exploration licence in relation to Certificate of Title Volume 5342 Folio 454, including correspondence with the applicant. 2) All documents relating to the application for, consideration of, and granting of EML6347, including correspondence with the applicant/tenement holder. 3) All documents relating to the application for, consideration of, and granting of an extension of EML6347, including correspondence with the applicant/tenement holder. 4) All documents relating to the application for, consideration of, and granting of the transfer of EML6347. 5) The current terms and conditions of EML6347, as well as all previous iterations of those terms and conditions (if any). 6) The Mining and Rehabilitation Program (MARP) and Mining and Rehabilitation Compliance Report (MARCR) associated with EML6347 including any amended or updated versions. | Due to file size, these documents are available on request: DEM.FOI@sa.gov.au |
21 August 2023 | F2023/001030 | All documentation pertaining to the cause and circumstances of the Port Lincoln bushfire, which commenced on or around 15 February 2023 in the vicinity of Duck Ponds SA 5607, including but limited to: - - Investigation reports; - Photographs; - Witness statements; and - Audio recordings and transcripts. | Due to file size, these documents are available on request: DEM.FOI@sa.gov.au |
7 August 2023 | F2023/000798 | We refer to the bushfire that occurred in Port Lincoln on 16 February 2023. We understand that the SA Country Fire Service (CFS) met with the Office of the Technical Regulator (OTR) on 22 February 2023 regarding the fire start. We now seek any and all documents and/or correspondence relating to this meeting that took place between the CFS and the OTR on 22 February 2023. Please include any report that was produced following the meeting. We also seek any and all documents and/or correspondence related to the cause of the fire on 16 February 2023 and/or any electrical/corrective work carried out on stobie pole DF 10538/R921 in its lifetime | Due to file size, these documents are available on request: DEM.FOI@sa.gov.au |
2 August 2023 | F2023/000722 | A copy of any internal Department of Energy and Mining correspondence in relation to the Terramin Bird in Hand Gold Project final decision. | F2023/000722 (PDF, 2.8 MB) |
20 July 2023 | F2023/000721 | A copy of any correspondence between the Department for Energy and Mining, or anyone employed at the Department for Energy and Mining, and Terramin, or anyone employed at Terramin, in relation to the Bird in Hand Gold Project final decision. | F2023/000721 (PDF, 438.3 KB) |
18 July 2023 | F2023/001239 | All correspondence between representatives of DEM and EML6347 tenement holders (and/or their solicitor on their behalf) between 1 June 2021 and 31 October 2021 in connection with EML6347. | F2023/001239 (PDF, 410.4 KB) |
18 July 2023 | F2023/001270 | We have had building inspections done and the builder has requested certificates of compliance etc regarding the build as there is major issues that he has found. Because they haven’t sent through these certificates to the building inspector or the council. The council has asked me to check if the compliance certificates have been done for the electricity, gas and plumbing. | F2023/001270 (PDF, 2.0 MB) |
14 July 2023 | F2023/000720 | Any correspondence between the Department for Energy and Mining, or anyone employed at the Department for Energy and Mining, and SA Water, or anyone employed at SA Water, between 14 March 2023 and 14 April 2023 in relation to water connection to the Hydrogen Power Station. | F2023/000720 (PDF, 501.5 KB) |
29 June 2023 | F2023/001120 | All Electrical Certificates of Compliance for my property. Documents 'From' date: 1/01/1980. 'To' date: 25/05/2023. | F2023/001120 (PDF, 817.6 KB) |
26 June 2023 | F2023/001113 | The latest copies of your internal complaint management policy for staff complaints and grievances, including procedure guides and reporting requirements. | F2023/001113 (PDF, 2.3 MB) |
14 June 2023 | F2023/001022 | I was injured during the course of my employment. I require a copy of my complete file held by Safe Work SA including all documents relating to Office of the Technical Regulator ('OTR') case file number CE 103698. | F2023/001022 (PDF, 9.4 MB) |
6 June 2023 | F2023/001079 | Requesting the ECOC for a solar installation. | F2023/001079 (PDF, 922.6 KB) |
9 May 2023 | F2023/000747 | I am seeking an historical Certificate of Compliance for electrical work done on my property by my ex-spouse, who was occupying the property. | F2023/000747 (PDF, 730.2 KB) |
26 April 2023 | F2023/000596 | All documents regarding an investigation by the office of technical regulator in regards to myself getting an electric shock at my neighbour’s house. | F2023/000596 (PDF, 22.8 MB) |
12 April 2023 | F2023/000638 | A copy of the photos taken by your officer inspection on 07/03/22 (Ref: CE104193). | F2023/000638 (PDF, 25.1 MB) |
3 April 2023 | F2023/000395 | All correspondence, documentation and reports from the Office of the Technical Regulator (OTR) concerning an electrical installation. This relates to the non-compliant electrical works on the property which was struck during excavation of the driveway in December 2021. | F2023/000395 (PDF, 10.8 MB) |
17 March 2023 | F2023/000406 | Requesting information from the Electrical Technical Standards and Safety Officer who attended the residence where I resided for the previous 10 years and disconnected the power supply. (CoC & full reports requested). I am also requesting information (CoC & full reports) from the electrician who attended to reconnect the electricity. | F2023/000406 (PDF, 11.5 MB) |
9 March 2023 | F2023/000125 | A copy of any briefings, memorandums, emails and other documents relating to Amendment 1 - Request for Proposal extension to Submission close date for Tender Code DEM052571. | F2023/000125 (PDF, 1.8 MB) |
8 March 2023 | F2022/001412 | Documents relating to pressure safety valve gas releases on the Moomba to Adelaide Pipeline in November and/or December 2022. | F2022/001412 (PDF, 4.5 MB) |
17 January 2023 | F2022/001405 | A list of all current staff within the Office of Hydrogen Power South Australia and their classifications and salaries. | F2022/001405 (PDF, 400.5 KB) |
16 January 2023 | F2023/000096 | Copy of the certificate for electrical work carried out at my property. | F2023/000096 (PDF, 856.3 KB) |
Date of determination | Agency reference | Application summary | Copy of or link to document (or advice about how to access document) |
---|---|---|---|
23 November 2022 | F2022/001232 | CoC documents from electrical trades that relate to my newly purchased property. | F2022/001232 (PDF, 839.0 KB) |
31 October 2022 | F2022/001044 | Audit Management Letters from the Auditor-General to the Department, and their corresponding responses, relating to the 2021-22 financial year. | F2022/001044 (PDF, 2.2 MB) |
20 October 2022 | F2022/001011 | A transaction list pertaining to all expenditure by the former Office of the Minister for Energy and Mining. | Documents are available on request: DEM.FOI@sa.gov.au |
19 October 2022 | F2022/000975 | All documents relating to solar case investigation. | Documents are available on request: DEM.FOI@sa.gov.au |
31 August 2022 | F2022/000878 | Requesting access to ECOC. | F2022/000878 (PDF, 820.5 KB) |
8 August 2022 | F2022/000656 | When our home was built, we received a Certificate of Compliance for the Gas Installation. We have since misplaced this certificate and require a copy. | F2022/000656 (PDF, 101.6 KB) |
4 August 2022 | F2022/000706 | Electrical CoC for the home I built and live in. | F2022/000706 (PDF, 909.5 KB) |
28 July 2022 | F2022/000650 | A copy of all documents regarding Dulux paint products, from 21 March 2022 to 30 June 2022. | F2022/000650 (PDF, 184.4 KB) |
15 July 2022 | F2022/000599 | Requesting COC for gas and all the others for our property. | F2022/000599 (PDF, 1.4 MB) |
14 July 2022 | F2022/000531 | A copy of the Office of the Technical Regulator / DEM file relating to an electric shock incident. | F2022/000531 (PDF, 1.9 MB) |
11 July 2022 | F2022/000537 | We are seeking to find a copy of the certificate of compliance for electrical works undertaken on my property without my consent. | F2022/000537 (PDF, 1023.6 KB) |
8 July 2022 | F2022/000534 | A copy of all electrical certificate of compliance (eCoC) applicable to recently purchased property. | F2022/000534 (PDF, 1.7 MB) |
1 June 2022 | F2022/000416 | All electronically searchable documents mentioning or related to the firm of Pyne and Partners, Hon Christopher Pyne or Mr Adam Howard. Dated from 17/03/2018 to 22/03/2022. | F2022/000416 (PDF, 1.5 MB) |
24 May 2022 | F2022/000417 | All electronically searchable documents mentioning or related to the company known as "Elbit Systems". Dated from 17/03/2018 to 22/03/2022. | F2022/000417 (PDF, 196.9 KB) |
23 March 2022 | F2022/000168 | Requesting all available information regarding investigations and complaints of customers made against my company. | Documents are available on request: DEM.FOI@sa.gov.au |
21 January 2022 | F2022/000087 | Requesting emails of alleged complaints from the public about the installation of solar generators installed on certain properties. | F2022/000087 (PDF, 140.4 KB) |
Date of determination | Agency reference | Application summary | Copy of or link to document (or advice about how to access document) |
---|---|---|---|
16 December 2021 | F2021/001093 | Copies of all credit card statements for credit cards held by all Executive Assistants/Personal Assistants in the Office of Chief Executive for the Department for Energy and Mining. Copies of all documents and records including but not limited to financial statements, bank statements, credit card statements, briefings, minutes, correspondence, reports, emails, receipts, letters, and written notes of reimbursements paid to the Chief Executive of the Department for Energy and Mining. | F2021/001093 (PDF, 5.0 MB) |
16 December 2021 | F2021/000980 | Our client’s property was damaged by a fire. We have obtained a copy of the report prepared by the South Australian Metropolitan Fire Service (SAMFS). The SAMFS investigated the cause of the fire and concluded that the fire was caused by aerial power lines owned by the South Australian Power Network (SAPN) igniting our client’s combustible brush fence. We request a copy of all documents concerning the investigation into the fire, any photographs relating to the fire or the investigation into the fire and all correspondence on preliminary internal inquiries or initial review conducted by SAPN, SAPN’s inspection logs for the aerial power lines above our client’s property and SAPN’s maintenance documents in respect of the aerial powerlines above our client’s property. | F2021/000980 (PDF, 22.6 MB) |
14 December 2021 | F2021/001119 | All documents that provide the following information: A breakdown of the total amount of funds made available towards the Minister’s Discretionary Fund in: 2018/19 2019/20 2020/21 2021/22. A breakdown of all funds allocated from the Minister’s Discretionary Fund in each of the following years and what the funds were allocated for: 2018/19 2019/20 2020/21 2021/22. The total funds remaining in the Minister’s Discretionary Fund for 2021/22 as of 12 December 2021. | F2021/001119 (PDF, 539.0 KB) |
10 December 2021 | F2021/000412 | Ministerial submissions, briefings and/or other correspondence submitted to the Minister for Energy and Mining, the Hon Dan van Holst Pellekaan MLA, concerning the Buckland Dry Creek Ltd Salt Fields and/or related environmental impacts on the St Kilda mangroves. |
These documents are available on request: DEM.FOI@sa.gov.au |
10 December 2021 | F2021/001092 | I would like access to the Electrical Certificate for Compliance (ECoC) for a property. The original certificate is dated 1997, but the current wiring does not match the specifications on the ECoC. | F2021/001092 (PDF, 2.3 MB) |
10 December 2021 | F2021/001061 | Certificate of compliance for plumbing work. | F2021/001061 (PDF, 440.3 KB) |
29 November 2021 | F2021/001060 | Electrical Certificate of Compliance | F2021/001060 (PDF, 1.3 MB) |
16 November 2021 | F2021/000979 |
| F2021/000979 (PDF, 674.5 KB) |
12 November 2021 | F2021/000922 | Report from the 2020/2021 review of the Targeted Lead Abatement Program covering Nyrstar’s Port Pirie lead smelter operations. | F2021/000922 (PDF, 852.4 KB) |
08 November 2021 | F2021/000921 | Copy of Electrical Certificates of Compliance issued to a private address between 08/10/2016 to 08/10/2021. | F2021/000921 (PDF, 938.9 KB) |
30 September 2021 | F2021/000824 |
1. The Mine Operations Plan (MOP) for the Carey Gully Quarry (Private Mine 110 – Curia Mudbricks) 2. Any subsequent amendments to the MOP 3. Any applications to amend the MOP in the last 5 years. | F2021/000824 (PDF, 3.7 MB) |
17 September 2021 | F2021/000530 |
1. Emails that contain either of the following phrases: - ‘update the regulatory frameworks for embedded networks’ or - ‘updating the regulatory frameworks for embedded networks’. 2. Reports or summaries of reports prepared by consultants engaged. |
Due to size limitations, these documents are available on request: DEM.FOI@sa.gov.au |
15 September 2021 | F2021/000662 | List of all public servants seconded to Minister for Energy and Mining’s office. Number of complaints, concerns, conflict or dispute avoidances, request for transfers and workers compensation claims raised by staff employed in the Minister for Energy and Mining’s office. Any documents that refer to complaints, concerns, conflict or dispute avoidances, request for transfers and workers compensation from 22 March 2018 to 7 July 2021. |
These documents are available on request: DEM.FOI@sa.gov.au |
24 August 2021 | F2021/000757 | Hillgrove Resources 2020, Program of Environmental Protection and Rehabilitation (PEPR), Visual Impact Assessment, Pumped Hydro Energy Storage – Groundwater Impact Assessment Modelling Summary; and Groundwater Monitoring Event – Kanmantoo Copper Mine, August 2020. | F2021/000757 (PDF, 205.7 KB) |
11 August 2021 | F2021/000724 | Copy of all minutes of meeting and records of the Office of the Technical Regulator relating to its consideration and assessment in 2010 to 2012 of SAPNs approach to disconnection and non-auto operation of recloses in bushfire risk areas on fire danger days in light of recommendation 32 of the Victorian Bushfire Royal Commission as mandated by State Bushfire Coordination Committee. | F2021/000724 (PDF, 903.4 KB) |
10 August 2021 | F2021/000619 | Certificate of Compliance for private address. | F2021/000619 (PDF, 470.5 KB) |
23 June 2021 | F2021/000248 | All documents referencing the number of local jobs created by Sonnen since establishing a headquarters in South Australia. | |
23 June 2021 | F2021/000253 | All documents referencing all costs associated with advertising South Australia’s Home Battery Scheme. | |
11 June 2021 | F2021/000491 | 2 x ECOC for my property. | |
8 June 2021 | F2021/000440 | Copies of certificates of compliance documents that exist for plumbing and gas work undertaken at my property between 31/1/20 and 12/5/21 | |
3 June 2021 | F2021/000196 | Any formal and/or informal correspondence between Hanson and/or their representatives with DEM and/or the EPA as it pertains to Hanson’s newly submitted MOP between Jan 2018 and Feb 2021. |
These documents are available on request: DEM.FOI@sa.gov.au |
20 May 2021 | F2021/000247 | All documents referencing the number of local jobs created by Alpha ESS since signing an agreement with the State Government to manufacture batteries in Adelaide. | F2021/000247 (PDF, 615.2 KB) |
20 May 2021 | F2021/000249 | All documents referencing the number of local jobs created by Akuo Energy since investing in the Jane Eliza Solar Farm. | F2021/000249 (PDF, 197.5 KB) |
20 May 2021 | F2021/000250 | All documents referencing the number of local jobs created by the Home Battery Scheme. | |
20 May 2021 | F2021/000252 | All documents referencing the number of local jobs created by Hydrostor since receiving $3 million in funding through the South Australian Government’s Renewable Technology Fund. | |
17 May 2021 | F2021/000200 | Ministerial briefings, status papers, emails and other correspondence relating to the consideration or implementation of the Australian Energy Market Commission’s recommended law and rule changes updating the regulatory frameworks for embedded networks. | |
6 May 2021 | F2021/000368 | Copy of all audit reports conducted by the office of the technical regulator | F2021/000368 (PDF, 9.8 MB) |
6 May 2021 | F2021/000332 | Documents regarding an inspection report for plumbing conference | F2021/000332 (PDF, 3.0 MB) |
1 April 2021 | F2020/000865 |
Documents are sought referencing or discussing: 1.Land access agreements (i.e. wavers of exemption, purchase agreements, options to purchase, compensation agreement, or other access arrangements); and 2.Land access agreements (as defined in 1) relating to Ministerial/formal approval of the Hillside PEPR. |
These documents are available on request: DEM.FOI@sa.gov.au |
31 March 2021 | F2021/000227 | Documents evidencing communications between any officer or representative of the Department for Energy and Mining regarding/which references Buckland Dry Creek. |
These documents are available on request: DEM.FOI@sa.gov.au |
22 February 2021 | F2021/000171 | Certificate of compliance for a private property. | F2021/000171 (PDF, 2.2 MB) |
22 February 2021 | F2021/000163 | Certificate of compliance for solar panels installed at a private property. | F2021/000163 (PDF, 2.3 MB) |
22 February 2021 | F2021/000155 | Certificates of compliance for a private property. | F2021/000155 (PDF, 4.9 MB) |
11 February 2021 | F2021/000920 | Copy of current Mine Operations Plan (MOP) for Private Mine PM188 and any new MOP submitted. | F2021/000920 (PDF, 5.5 MB) |
10 February 2021 | F2021/000106 | Copy of report and images supplied by the officer who attended a private property. | F2021/000106 (PDF, 1.5 MB) |
10 February 2021 | F2021/000107 | Copy of the Mine Operations Plan (MOP) for the White Rock Quarry (Private Mine 188) approved in March 2005; any subsequent amendments to the MOP; and any applications to amend the MOP in the last 5 years. | F2021/000107 (PDF, 5.5 MB) |
5 February 2021 | F2020/000724 | Access to documents regarding the assessment and approval of the Olympic Dam Mine BHP proposed “Tailings Storage Facility Six” (TSF 6) in 2019. |
Due to size limitations, these documents are available on request: DEM.FOI@sa.gov.au |
22 January 2021 | F2020/001010 | Documents relating to underground wiring works installed in Kadina, SA, as part of Council's recent upgrades works in the town centre on or around 22 July 2020. | F2020/00101 (PDF, 6.3 MB) |
Date of determination | Agency reference | Application summary | Copy of or link to document (or advice about how to access document) |
---|---|---|---|
17 December 2020 | F2020/000788 | Complete file in relation to the Yorketown Fire which started on or around 20 November 2019. |
Due to size limitations, these documents are available on request: DEM.FOI@sa.gov.au |
16 December 2020 | F2020/000818 | I write to seek access to documents referred to in the Investigation Report into the Cudlee Creek bushfire. |
Due to size limitations, these documents are available on request: DEM.FOI@sa.gov.au |
7 December 2020 | F2020/000789 | Complete file in relation to the Cudlee Creek fire which started on or around 20 December 2019. |
Due to size limitations, these documents are available on request: DEM.FOI@sa.gov.au |
5 November 2020 | F2020/000901 | Electronic Certificates of Compliance for Plumbing, Gas and Electricity for recent works on a private property from the Office of the Technical Regulator. | F2020/000901 (PDF, 13.1 MB) |
13 October 2020 | F2020/000858 |
Please provide copies of any guidelines, policies, procedures, or factsheets that applied during the period 2006 – 2008 (inclusive), that related to the imposition of rehabilitation securities, including documents relating to:
| F2020/000858 (PDF, 4.2 MB) |
19 August 2020 | F2020/000694 | SAPN's 'Safety, Reliability, Maintenance and Technical Management Plan, approved by the Office of the Technical Regulator for the 2019/2020 period; SAPN's Vegetation Manual (Manual #37) operative for 2019/2020 period; Detailed route and/or constructions plan for SAPN feeder GU43. | F2020/000694 (PDF, 3.5 MB) |
25 June 2020 | F2020/000577 | Copy of Certificate of Compliance G150322 | F2020/000577 (PDF, 3.8 MB) |
18 June 2020 | F2020/000521 |
| F2020/000521 (PDF, 1.3 MB) |
15 May 2020 | F2020/000494 | Copy of all Electrical Certificates of Compliance issues to a private address. | F2020/000494 (PDF, 3.1 MB) |
15 May 2020 | F2020/000478 | Copies of any asset management plans or policies submitted by SA Power Networks Pty Ltd to the Office of the Technical Regulator which are/were intended to be operational for the period from 1 January 2018 to date. | F2020/000478 (PDF, 1.7 MB) |
15 May 2020 | F2020/000190 | Documents and correspondence relating to GFG Alliance and a public debt guarantee for the Whyalla steelworks from March 2018 to present. | F2020/000190 (PDF, 2.9 MB) |
1 May 2020 | F2020/000480 | Fire that started on or around 20 December 2019 in the Adelaide Hills of the state of South Australia causing damage to property, commonly referred to as the Cudlee Creek Fire.
|
Due to size limitations these documents are available on request: DEM.FOI@sa.gov.au |
1 May 2020 | F2020/000479 | All available Certificates of Compliance (electricity, plumbing, gas) for a residential address. | F2020/000479 (PDF, 3.4 MB) |
1 May 2020 | F2020/000462 | Report and any associated documents prepared by the Office of the Technical Regulator in relation to an inspection undertaken after a residential building fire allegedly involving solar panels at a property on 16 January 2018. | F2020/000462 (PDF, 10.4 MB) |
1 May 2020 | F2020/000402 | Fire that started on or around 20 November 2019 at or near Yorketown in the state of South Australia causing damage to property, commonly referred to as the Yorketown Bushfire.
| F2020/000402 (PDF, 24.7 MB) |
21 April 2020 | F2020/000468 | All certificates of compliance from 8/04/2019 to 8/04/2020. | F2020/000468 (PDF, 3.9 MB) |
21 April 2020 | F2020/000359 |
All documentation pertaining to the investigation into the cause and circumstances of the Yorketown bushfire, which commenced on or around 15:30 pm on Wednesday 20 November 2019 in the vicinity of Stansbury Road, Yorketown SA 5572, including but not limited to:
|
Due to size limitations these documents are available on request: DEM.FOI@sa.gov.au |
21 April 2020 | F2020/000358 |
All documentation pertaining to the investigation into the cause and circumstances of the Cudlee Creek bushfire, which commenced on or around 15:30 pm on Wednesday 20 November 2019 in the vicinity of Holland Creek Road, Cudlee Creek SA 5232, including but not limited to:
|
Due to size limitations these documents are available on request: DEM.FOI@sa.gov.au |
21 April 2020 | F2020/000356 | We have been engaged by HWL Ebsworth Lawyers who are acting on behalf of Millennium Insurance and Tokio Marine Insurance. We are requesting a copy of the investigation report in relation to a fire at Yorketown on 20/11/2019 involving a SA Power Networks wire coming away from near a water tower in Yorketown. | F2020/000356 (PDF, 1.3 MB) |
31 March 2020 | F2020/000457 | Specifications and details and the weight of the refractory block that hit me in the back in December 2017. It was the full hanging roof block in the electric furnace at Olympic Dam, Roxby Downs, BHP. I was working for Veolia Refractories. | F2020/000457 (PDF, 644.2 KB) |
19 March 2020 | F2020/000126 |
Attachment to Freedom of Information Application Form – Pipeline explosion Monday, 1st July 2019. Details of documents requested – Concerning a widely reported incident at the Santos gas pipeline located on the Strzelecki Track at the Cooper Basin, between Innamincka and Merty Merty on Monday 1st July
2019. The incident was variously described in public sources as a “small gas release”, “explosion” and “minor leak”. An investigation was reported to be underway by the Department for Energy and Mining. North West Protection Advocacy requests access to the following documents:
|
Due to size limitations these documents are available on request: DEM.FOI@sa.gov.au |
4 March 2020 | F2020/000383 | Copies of electrical certificates of compliance for property. | F2020/000383 (PDF, 72.1 KB) |
25 February 2020 | F2020/000345 | Certificate of compliance for gas installation, in particular the replacement of the gas main servicing the property; Certificate of compliance for electrical installation at a private address. | |
12 February 2020 | F2020/000328 | Electric shock and/or incident report for the Office of the Technical Regulator – 19/10/2019 to 31/01/2020. | |
12 February 2020 | F2020/000280 | Seeking to obtain copies of all certificates of compliance in relation to: Electrical Plumbing Gas for a private address. | |
12 February 2020 | F2020/000251 | Seeking the following from the Office of the Technical Regulator:
| |
29 January 2020 | F2019/005830 | All documents, notes, briefings, memos, correspondence, reports, emails, SMS's, directions, instructions, including drafts, relating to Tom Koutsantonis MP, Member for West Torrens not including correspondence already sent or received by Mr Koutsantonis from the agency – 1/7/2018 to 15/11/2019. |
Date of determination | Agency reference | Application summary | Copy of or link to document (or advice about how to access document) |
---|---|---|---|
17 December 2019 | F2019/005868 | Cost of indoor plants in the Department - 1/1/19 to 21/11/19. | |
20 November 2019 | F2019/005198 | Copy of lodged eCOCs for two properties. | |
18 November 2019 | F2019/005165 | Copy of eCOC for an electrical installation on a Nectre Gas Fireplace in September 2018. | |
8 November 2019 | F2019/004044 |
1. Copies of all government reports concerning the risk assessment of Mine Tailings Storage Facilities (TSF) at Olympic Dam from 2017 to 2019. 2. Copies of all Annual Olympic Dam Tailing Reports 2017 to 2019. |
Due to size limitations these documents are available on request: DEM.FOI@sa.gov.au |
21 August 2019 | F2019/003566 | Electrical safety certificates of compliance – 22 July 2000 to 22 July 2019. | |
15 August 2019 | F2019/003136 | All letter/email correspondence sent to property owner by OTR. All letter/email correspondence sent to OTR by property owner. | |
14 August 2019 | F2019/004043 | Electrical Certificate of Compliance submitted of 2 August 2019. There are 2 files attached with this ecoc (1 is a pdf and the other is a word document I was told) that I need emailed to me from your department. There is a link in the ecoc to these 2 files, but these files are not given to the customer | |
13 August 2019 | F2019/004057 | Copy of an Electric Shock/Incident Report. | |
13 August 2019 | F2019/003565 | Copies of any reports into bird deaths at BHP’s evaporation ponds at Olympic Dam. Copies of any photos and/or videos of dead birds at BHP’s evaporation ponds at Olympic Dam. | |
12 August 2019 | F2019/002766 | The calendar and/or diary of the Chief Executive of the Department for Mining and Energy including the names of any Government attendees at meetings – 1 March 2018 to 13 June 2019. | |
27 July 2019 | F2019/002758 | A copy of all documents including briefings and/or advice, minutes, notes, emails, SMS’s and correspondence regarding the outage or availability of the Loy Yang Power Station and its impacts on the South Australian Energy Market and the reliability of the South Australian Energy Grid and/or Energy Network | |
24 July 2019 | F2019/003094 | We act in relation to a claim made for damages for personal injuries arising from an incident that occurred on 4 January 2016. We are instructed that investigations of the incident were undertaken by the Office of the Technical Regulator and request a copy of the entire file of the incident on 4 January | |
24 June 2019 | F2019/001394 | FOI request re EL 5984 (formerly (EL4961, 3733) information re exploration activities at the Wombat and Alford West prospects (Bruce). Request under the provisions of Section 77D of the Mining Act 1971 and Regulation 88 of the Mining Regulations 2011, PACE and licence conditions schedule C intersection
| |
19 June 2019 | F2019/001078 | All documents requested below are in reference to ML5524, EML5525 (Poona Mine NNE of Moonta) and ML5696 (Wheal Hughes Mine NNE of Moonta).
| |
6 June 2019 | F2019/002192 | A copy of all Electrical Certificates of Compliance for address between 01/07/18 and 24/05/19 | |
6 June 2019 | F2019/002100 | Access to any independent modelling of job creation figures undertaken by the South Australian Government in regards to offshore oil and gas exploration in the Great Australian Bight. Copies of correspondence between South Australian Government and APPEA in regards to the two documents titled | |
18 April 2019 | F2019/000881 |
All documentation held by the department regarding the operations of PM237, including but without limitation: a. Royalties paid by Southern Quarries as operator of PM237 for 1/1/2017 to 31/12/2018; b. All mining production returns for 1/1/2014 to 31/12/2018; c. The current and earlier versions of the Mine Operations Plan in relation to PM237; d. Any documentation held by the department in relation to the quantity of material extracted from PM237; e. Copies of any reports required to be submitted for the period 1/1/2014 to 31/12/2018; and f. Copies of any rectification or compliance orders or directions issued. | F2019/000881 (PDF, 3.0 MB) |
18 April 2019 | F2019/001217 |
All information lodged by the manufacturer and all documents relevant to the issuing of certificate of approval for the Bosch S9 branded series of dishwashers including assessments regarding Australian Standards and also all documents relevant to the recall of these dishwashers, specifically but not included to type S9 SGS4353AU as outlined in the product recall notice. | F2019/001217 (PDF, 4.2 MB) |
F2019/001192 | Copies of documentation with regard to any licenses issued to the worker allowing any access or permission to conduct mining activity of any kind in or around the township of Mintabie. | F2019/001192 (PDF, 2.6 MB) | |
4 April 2019 | MER2018/1379 | Documents regarding Display Tender LCE040937: Standards of service and/or performance indicators that bids were judged on; and the accountability of the agency regarding conduct of the tender process and decisions made in relation to awarding the tender. | MER2018/1379 (PDF, 5.6 MB) |
21 March 2019 | MER2018/1674 | Copies of all documents relating to the procurement of RateSetter and/or decision to award the contract to RateSetter. | MER2018/1674 (PDF, 25.5 MB) |
8 March 2019 | MER2019/0517 | Any complaints and/or correspondence received by the department relating to Mining Tenement Exploration Lease EL5832. | MER2019/0517 (PDF, 32.6 MB) |
26 February 2019 | MER2019/0026 |
a. All minutes of meetings relating to the suspension of the production period for the Leigh Creek Energy in-situ gasification (ISG) demonstration plant, approved on 7 November 2018 (7 November 2018 Suspension). b. All correspondence by or sent by the department in relation to the 7 November 2018 Suspension. c. All briefs or reports by or prepared by the department in relation to the 7 November 2018 Suspension. d. Any documentation received by or prepared by the department in relation to the Management of Change processes for the re-ignition works associated with the 7 November 2018 Suspension. | MER2019/0026 (PDF, 13.8 MB) |
21 February 2019 | MER2019/0465 | Copies of photographs, showing possible trespass, and paperwork sent in of trench for irrigation/water pipe. | MER2019/0465 (PDF, 3.3 MB) |
21 February 2019 | MER2019/0567 | Copy of investigation report of domestic gas explosion on 25 November 2018 investigated by the department. | MER2019/0567 (PDF, 3.0 MB) |
24 January 2019 | MER2019/0110 | Copies of gas and electrical certificates of compliance. | MER2019/0110 (PDF, 15.0 MB) |
22 January 2019 | MER2018/1769 | Since 17 March 2018, copies of any and all physical, electronic and written briefs, minutes and draft versions of the Aboriginal Affairs Action Plan. | MER2018/1769 (PDF, 33.8 MB) |
16 January 2019 | MER2018/1716 | All documents detailing the cost of indoor plants in the department for the period 18 March 2017 to 17 March 2018 and 18 March 2018 to date. | MER2018/1716 (PDF, 2.0 MB) |
Date of determination | Agency reference | Application summary | Copy of or link to document (or advice about how to access document) |
---|---|---|---|
29 October 2018 | MER2018/1284 | Relevant portion of minutes of the Renewables SA Board meeting in which submission was reviewed. Date range: 10/5/2010 to 10/6/2010. | MER2018/1284 (PDF, 12.3 MB) |
22 October 2018 | MER2018/1394 | All documents relating to activities on EML6090, specifically the PEPR or declaration of environmental factors covering all mine activities. | MER2018/1394 (PDF, 18.0 MB) |