Programs for environment protection and rehabilitation (PEPR) and mine operation plans (MOP)

All mining operations are regulated through approved programs. Mining leases (MLs/EMLs) and miscellaneous purposes licences (MPLs) must be operated in accordance with an approved program for environment protection and rehabilitation (PEPR), while operations on a private mine must be in accordance with an approved mine operations plan (MOP).

When a ML or MPL is granted the tenement holder must submit a PEPR within the required timeframe specified in the lease conditions. Operations cannot commence until an approved PEPR is in place.

MOPs must be prepared in accordance with the regulatory guideline MG12: Mine operations plans:

PEPRs must be prepared in accordance with the relevant terms of reference:

Further information on  PEPRs and MOPs can be found on the Regulatory guidelines page of this website.

Back to top

Approved programs

A list of PEPRs and MOPs approved in the last 12 months can be found in the table below.

Approved program Tenement holder(s) or Operator(s) Tenement number(s) Commodity or ResourceLocation Approval date and letter
Siviour Graphite Project Ausmin Development Pty LtdML 6495GraphiteApproximately 12 km west of Arno Bay 8 September 2026
Youngs Quarry C.L. Land Management Pty LtdPM 214QuartziteApproximately 15 km south east of Port Pirie28 August 2026
Gericke's Pit
(Not available at this time)
K.D. & H.M. Gericke Proprietary LimitedML 6567Calcrete
Coombe area, North-West of Keith
26 August 2026
Kalkaroo Copper Project Kalkaroo Copper Pty Ltd; Sandfire South Australia Pty LtdMLs 6498, 6499, 6500 and MPL 158Exploration Drilling ProgramCurnamona Province 4 August 2026
Prominent Hill Mine OZ minerals Prominent Hill Operations Pty  LtdML 6228, MPLs 81, 82, 83, 84, 91, 93, 94, 96, 97, 101, 112-117, 119-122 and 169-176 EMLs 6234, 6236-6242, 6278,6296 and 6299-6301Copper, Gold, Silver Coober Pedy area 26 June 2026
Kalkaroo Copper Gold ProjectKalkaroo Copper Pty Ltd
Sandfire Resources (SA) Pty Ltd  
MLs 6498, 6499, 6500, MPL 158Exploration Drilling ProgramBroken Hill area01 May 2026
Alexandrina QuarryHP Resources SA Pty Ltd ML 6563Limestone, SandStrathalbyn area28 April 2026
Tooperang  Sand  PitMark Steen Meyer and Kerry Elizabeth CrossEML 5331
EML 5864
EML 6449
Clay
Gravel
Sand
Silica Sand
Tooperang area24 April 2026
Victor Harbor Quarry Victor Harbor Quarries Pty LtdPM 197, EML 4859, MPL 162Meta-silt Stone Victor Harbor 27 February 2026
Dublin PitLeinad Land Management Pty LtdEML 6560LimestoneDublin area 25 February 2026
Salt Creek Sand PitLongs Sands and Metal Pty LtdEML 6140Gravel, Sand Pallamana area2 February 2026
Jacinth Ambrosia Iluka (Eucla Basin) Pty LtdML 6315, MPL 110, MPL 111, MPL 161, EML 6316, EML 6325, EML 6326, EML 6330, EML 6331, EML 6332, EML 6333, EML 6334Heavy Mineral Concentrate, Ilmenite, Leucoxene, Monazite, rutile, Tin, Zircon,  Limestone, Calcrete, Granite,  Gravelapproximately 800 km northwest of Adelaide30 January 2026
Mindarie Mineral Sands Project - Mercunda Strandline
(PDF, 33.7 MB)
Murray Zircon Pty LtdML 6137, 6225, 6220
MPLs 77, 79
Heavy Mineral Concentrate, Ilmenite, Leucoxene, Rutile, ZirconLoxton area 
Hartley Rubble Pit (PDF, 56.7 MB)Futuretop Developments Pty LtdML 6564Limestone, sandStrathalbyn  area1 December 2025
Carrara Marble Quarry (PDF, 101.6 MB) Amulet Holdings Pty LtdML 6556, PM 111Marble (Limestone)

Adelaide Kapunda

21 October 2025
Carapateena Mine - Volume 1 (PDF, 62.6 MB)
Carapateena Mine - Volume 2 (PDF, 129.0 MB)
OZM Carrapateena Pty Ltd
OZ Minerals Carrapateena Pty Ltd
ML 6471, MPLs 149, 152, 153, 154, 156Copper, Gold, SilverPernatty area18 September 2025

Note:  All MOPs received prior to the implementation of the new Mining Act and regulations effective 1 January 2021 are listed for reference only, the associated documentation is not publicly accessible. MOPs received after 1 January 2021 are listed above inclusive of documentation.

Previously approved PEPRs can be accessed via the following:

Back to top

Change to a mining operation

If a change to existing operations or circumstances is proposed within an existing mining tenement, the tenement holder must submit a change in operations application in accordance with:

A list of change in operation approvals approved in the last 12 months can be found in the table below.

Approved program Tenement holder or Operator Tenement number Requested changeLocation Approval date
South Middleback Range Mining Area OneSteel Manufacturing Pty Limited operating as SIMEC Mining  (Administrators Appointed)MPL 32Pursuant to Section 56U(1) of the Mining Act 1971, the Minister for Energy and Mining grants an approval for a Change in Operations to add, vary or revoke a term or condition of Miscellaneous Purposes Licence 32 to allow for the construction and operation of an access road, the construction and operations of a Waste Rock Dump, and the construction and operations of topsoil stockpiles.

Pursuant to Section 56J of the Mining Act 1971, the Minister for Energy and Mining (the Minister) to add, vary or revoke a term or condition of a mineral tenement to which this section applies if the Minister considers that the addition, variation or revocation is necessary — (a) to offset, stabilise, prevent, reduce, minimise or eliminate any potential, perceived or actual undue damage to the environment associated with authorised operations carried out under the tenement; or (b) to ensure consistency with the conditions attached to the Commonwealth Minister's approval (if any) under the Environment Protection and Biodiversity Conservation Act 1999 of the Commonwealth; or (c) taking into account any other matter prescribed by the regulations
Approximately 50 km south-east of Whyalla02/05/2025
Mindarie Mineral Sands Project - Mercunda StrandlineMurray Zircon Pty LtdMLs 6137, 6220, 6220, MPLs 77, 79As a result of a slower ramp up and commissioning issues associated with Mercunda’s processing plant, mining including pre-stripping of topsoil, subsoil and overburden has progressed ahead of the processing production rate and expected clearing schedule. This has resulted in a larger than expected disturbance area open at any point in time.

The scope of the proposed change is limited to the disturbance area and stockpile volumes through operations. The rehabilitation method remains as per that described in MPEPR2022/167. Whilst the rehabilitation method remains the same, the mine and rehabilitation plan and timing requires minor scheduling changes to accommodate variations in plant performance which is a key driver for the provision of rehabilitation material to enable backfilling of the pit.
Approximately 150 km east of Adelaide in the Murray Mallee Region17/05/2024

All associated documentation can be accessed via the South Australia Mining Register.

Back to top