Updates on Middleback Ranges
30 July 2025 – SMR PEPR Review approved
SIMEC’s PEPR Review for the South Middleback Ranges Area has been approved by the Director of Minerals Regulation in accordance with section 70C of the Mining Act, without alteration.
The approval of this PEPR incorporates the changes authorised in the Change in Operations approved on 2 May 2025 and allows for a raise to the Tailings Storage Facility, subject to DEM’s endorsement of the final design of Raise 9.
SIMEC initially submitted the PEPR review for assessment on 30 September 2024, with the final version submitted on 30 June 2025. DEM has undertaken a detailed assessment to ensure that all matters raised by Government have been appropriately addressed and control measures proposed by SIMEC, to avoid or manage confirmed impact events to accepted industry standards or limits prescribed in relevant EPA Environment Protection Policies.
2 May 2025 – SMR Change in Operations approved
SIMEC’s Change in Operations application has been approved by the Director of Minerals Regulation in accordance with Division 7 of the Mining Act.
The approval of this Change in Operations application will facilitate the Magnetite Expansion Project Phase 1 (MEP1) by allowing for the expansion of an existing waste rock dump south into MPL 32, realigning the access road around the waste rock dump, and constructing a topsoil stockpile on the waste rock dump.
SIMEC submitted the Change in Operations application on 16 August 2024. The application was published on DEM’s website inviting comments from the public, however no submissions were made. DEM has undertaken a detailed assessment to ensure that all matters raised by Government have been appropriately addressed and environmental outcomes proposed by SIMEC are appropriate.
A PEPR review will be required to incorporate the changes outlined in the approved change in operations application, along with other updates related to the MEP1 project.
03 April 2025 – IBMA PEPR Review approved
SIMEC’s PEPR for Iron Barron Mining Area has been approved by the Director of Minerals Regulation in accordance with section 70C of the Mining Act, without alteration.
The approval of this PEPR will allow SIMEC continue to undertake mining operations at the IBMA, primarily for hematite extraction.
SIMEC submitted the PEPR review for assessment on 15 August 2024. DEM has undertaken a detailed assessment to ensure that all matters raised by Government have been appropriately addressed and control measures proposed by SIMEC, to avoid or manage confirmed impact events to accepted industry standards or limits prescribed in relevant EPA Environment Protection Policies.
19 February 2025
Sebastian Hams, Michael Korda, Lara Wiggins and Mark Mentha (KordaMentha Pty Ltd ACN 100 169 391) were appointed Administrators of OneSteel Manufacturing Pty Limited.
Resource
Iron ore (magnetite and hematite)
Location
Middleback Ranges, southwest of Whyalla, Eyre Peninsula
Company and tenement information
OneSteel Manufacturing Pty Ltd trading as SIMEC Mining Group
The Middleback Ranges Project comprises a number of tenements which are broadly considered under different mining areas.
Mining is undertaken in three areas with multiple pits, including:
- South Middleback Ranges (SMR) mining area
- Iron Baron mining area
- Iron Knob mining area
Download map showing Middleback Ranges tenements via the South Australian Resources Information Gateway (SARIG).
Mining operation and status
- Operating
- Open-cut mines in the Middleback Ranges producing magnetite ore for steel production and hematite ore for export, blended fines and pellets also shipping to Port Kembla and Newcastle in New South Wales
The deposit
Magnetite and hematite deposits within the Middleback Ranges (part of the Cleve sub-domain of the Gawler Craton, comprised primarily of Early Proterozoic metasediments of the Hutchison Group.
Resource estimates and production estimates
Company released resource estimates and production statistics for South Australia's major operating and approved mines are summarised in South Australia's Major Operating/Approved Mines Resource Estimates and Production Statistics
Approval process
Programs for environment protection and rehabilitation have been submitted and approved for each mining area.
Current documents
Mining proposals/Change in operations proposals
Program for environment protection and rehabilitation (PEPR)
- Iron Baron Mining Area - Program for Environment Protection and Rehabilitation MPEPR2024/023 (PDF 137 MB)
- South Middleback Range - Program for Environment Protection and Rehabilitation MPEPR2024/031 (PDF 215 MB)
- Iron Knob Mining Area - Program for Environment Protection and Rehabilitation MPEPR2023/012 (PDF 17 MB)
Mining compliance reports
2023-24
- Iron Knob Mining Area Annual Compliance Report 2023-2024 (PDF 50 MB)
- Iron Baron Mining Area Annual Compliance Report 2023-2024 (PDF 87 MB)