About the application
Application: Renewable Energy Infrastructure Licence (REIL)
Applicant: Willogoleche 2 Operating Trust, a subsidiary of ENGIE
Purpose: Construction, operation, maintenance and decommissioning of up to 20 wind turbine generators (WTG), a 200-megawatt/800-megawatt-hour Battery Energy Storage System (BESS) and a 14.6 km overhead transmission line (OTL)
Location
The project site is located approximately 6 km north-west of the Hallett township, in South Australia.
Documents for public comment
The Statement of Environmental Objectives (SEO) and Environmental Impact Report (EIR) and have been submitted by ENGIE, following stakeholder consultation.
Statement of Environment Objectives
Environmental Impact Report
Main report and Appendix A: Consultation report
Content for Appendix B through to Appendix J
- EIR Appendix B: Ecological constraints assessment (PDF, 10.4 MB)
- EIR Appendix C: Bird and bat utilisation summary final report (PDF, 4.0 MB)
- EIR Appendix D: Noise impact assessment (PDF, 4.3 MB)
- EIR Appendix E: Surface water impact assessment (PDF, 5.1 MB)
- EIR Appendix F: Electromagnetic interference assessment (PDF, 4.0 MB)
- EIR Appendix G: Visual impact assessment (PDF, 13.0 MB)
- EIR Appendix H: Aviation impact assessment (PDF, 2.5 MB)
- EIR Appendix I: Social impact assessment (PDF, 5.4 MB)
- EIR Appendix J: Traffic impact assessment (PDF, 1.7 MB)
Making a submission
You can submit your views by providing comments directly in the submission form (link provided below), or you can upload your comments to the submission form as a separate document.
Should you make a written submission, that submission becomes a public record. All written submissions will be provided to the applicant for consideration and will be made publicly available on the Hydrogen and Renewable Energy Register (unless deemed irrelevant, offensive, or on any other grounds that the Minister thinks fit) in accordance with the requirements of the HRE Act and regulations.
The delegate of the Minister for Energy and Mining is required to have regard to these submissions in determining whether to grant or refuse the application and, if granted, the terms and conditions on which it should be granted.
Closing date for submissions
Comments on the proposal must be submitted by 5:00 pm, 2 November 2026.
More information
If you have any questions about the consultation process contact Department for Energy and Mining – Energy Regulation:
- Email: dem.energyregulation@sa.gov.au
- Phone: +61 8846 33000