- A licensee who undertakes any drilling must furnish to the Minister, within 6 months after rig release, a well completion report in accordance with the requirements of these regulations.
Administrative penalty. - A well completion report must include:
a) the name and number of the well; and
b) a summary page or pages, located at the beginning to the well found in the report; and
c) a plan that shows -
(i) the location of the well relative to a horizontal control point and a bench mark established not more than 200 metres from the site of the well; and
(ii) the latitude and longitude of the well in GDA 94 values, computed within accuracy levels approved by the Minister; and
(iii) any permanent references marks established in accordance with these regulations; and
(iv) the direction of true north; and
(v) any other well and all roads, access tracks, public utilities or substantial buildings or other structures within 300 metres of the site of the well, and any significant topographical, environmental or cultural features; and
(vi) where applicable, the boundaries and legal description of the section of land within which the well is situated; and
d) the name of any drilling contractor; and
e) the spud date, the date of rig release, and the total depth drilled (to drillers and loggers depths, in metres); and
f) a summary of the lithologies encountered during the drilling, and a summary of the geological formations taken to have been encountered during drilling; and
g) a composite log, formulated to a scale comparable with the wireline logs used in connection with the drilling, that includes the following:
(i) the bit record
(ii) the penetration rate; and
(iii) the casing record;
(iv) a lithological summary;
(v) a geological formation tops;
(vi) representative open hole and cased hole logs;
(vii) sidewall core points;
(viii) palaeontological analysis results;
(ix) hydrocarbon shows;
(x) the drillstem test intervals and results;
(xi) core intervals and recoveries;
(xii) the log analysis result and;
h) core and sidewall sample descriptions, and an analysis of these; and
i) relevant petrographic descriptions; and
j) the palaeontological analysis results and interpretation; and
k) the formation test reports, charts and interpretation; and
l) log interpretations; and
m) details of hole sizes, casings and cementing that has been undertaken; and
n) details of well completion or abandonment; and
o) a velocity survey; and
p) geophysical interpretation of the target structure at relevant horizons. - For the purposes of sub-regulation (2), all depth references for a well must be in metres.
- A copy of a report under this regulation will be available for the public inspection after the expiration of 2 years for the date of rig release.
- Home
- News
-
About
- Our Department
- Our Minister
- Our leaders
- Economic dashboard
- Work with us
-
Open government
- Annual reports
- Freedom of information
-
Proactive disclosure
- Minister's credit card expenditure
- Chief Executive's credit card expenditure
- OHPSA Chief Executive’s credit card expenditure
- Minister's overseas travel expenditure
- Chief Executive's overseas travel expenditure
- DEM employee staff travel expenditure
- OHPSA Chief Executive’s overseas travel
- OHPSA employee overseas travel expenditure
- Minister's domestic and regional travel expenditure
- Chief Executive's domestic and regional travel expenditure
- OHPSA Chief Executive’s domestic and regional travel expenditure
- Minister's mobile phone expenditure
- Chief Executive's mobile phone expenditure
- OHPSA Chief Executive’s mobile phone expenditure
- Minister's ancillary expenditure
- Chief Executive's ancillary expenditure
- OHPSA Chief Executive’s ancillary expenditure
- Chief Executive's gift register
- OHPSA Chief Executive’s gift register
- Public interest disclosure
- Diversity and inclusion
-
Consumers
- Energy Advisory Service
- Power usage, savings and efficiency
- Energy contracts, billing and rebates
- Energy grid and supply
- Electrical, gas and plumbing safety
- Solar and batteries
- Electric vehicle subsidy
- Contacts
-
Industry
- Whyalla Steelworks Industrial Transformation Unit
- Hydrogen and renewable energy
- Green iron and steel
- Regulatory services
- Firm Energy Reliability Mechanism (FERM)
- Energy efficiency and productivity
-
Energy resources
- Investment
- Licensing and land access
-
Regulation
- Hydraulic fracture stimulation in the Limestone Coast region
- Regulatory overview
- Approvals process
- Public consultation
- Compliance and monitoring
- Environmental Register
- Licence annual reports
- Policies and Guidelines
- Regulatory research and compliance publications
- Projects of public interest
- Water and environmental management
- Offshore petroleum
- Prospectivity
- Infrastructure and markets
- Data Centre
- Industry activity
- Energy Resources Summit
- Further information
- Contacts
-
Minerals and mining
- Exploration
-
Mining
- Granted mineral tenements
- Approved programs
- Community engagement opportunities (public notices)
- Establish a mine or quarry
- Forms and fees
- Regulating mining activity
- Mining compliance
- Mineral royalties
- Operational information
- Major projects and mining activities
- Quarries
- Opal mining
- Mine closure and progressive rehabilitation
- Former mines
- Communities and land access
- Mining and Exploration Regulation System (MERS)
- Forms, legislation and guidance
- Investment
- Mineral commodities
- Maps, data and online tools
- Contacts
- Geological Survey
- Transformational projects
-
Public consultations
- Current consultations
-
Recent consultations
- FERM Market Liquidity Obligation Consultation
- Environmental liability management policy
- Draft Review of Standard for Dual Reticulation Infrastructure
- Statutes Amendment (Energy and Mining Reforms) Bill 2025
- Firm Energy Reliability Mechanism - Stage 2 Consultation
- Mining Act review
- Retailer Energy Productivity Scheme 2026-2030
- Firm Energy Reliability Mechanism: Stage one consultation
- The South Australian Copper Strategy refresh
- Small Claims Compensation Scheme
- Proposed removal of SAB2D5 from the Plumbing Code of Australia
- South Australia's National Energy Retail Law Regulations
- Controlled load profile and sample meters
- Energy and Mining on the Limestone Coast
- Release areas - Hydrogen and Renewable Energy Act
- Hydrogen and Renewable Energy Act
- Emergency Management (Electricity Supply Emergencies) Amendment Act 2017
- Past consultations
- Investment
- Quick links
